The return lane¶
Everything a project runtime reports leaves the kernel on one stream: the return lane. It is a durable, digest-chained journal of envelopes for one project runtime. The kernel appends, the data plane node pulls and acknowledges cumulatively, and the lane itself assigns every sequence number and chain digest. The sequence numbers fix the order of the envelopes, and the digest chain makes a removed or altered envelope detectable. This page covers the envelope, appending, pulling and acknowledging, and how the lane closes.
One lane per project runtime¶
flowchart LR
subgraph KERNEL["PROJECT KERNEL"]
direction TB
PROD["Producers<br/>evidence sink, status, logs, faults"]
subgraph LANE["RETURN LANE"]
direction TB
J[("Journal<br/>seq, prev_digest, digest")]
CUR[("Ack cursor<br/>last_acked_seq")]
end
PROD -->|"append draft"| J
end
subgraph NODE["DATA PLANE NODE"]
direction TB
PULL["Pull from next_seq"]
ACK["Cumulative ack"]
end
J -->|"page of envelopes"| PULL
ACK -->|"last_acked_seq"| CUR
The journal and the ack cursor live in the kernel's continuity store and survive a nucleus restart, so a node resumes from the acknowledged position. See The continuity store and cursor.
The envelope¶
| Field | Set by | Holds |
|---|---|---|
seq |
The lane | Position in the lane |
prev_digest, digest |
The lane | The chain: each envelope's digest covers the one before it |
context |
The lane, fixed when it opens | workspace_uuid, assignment_id, run_id, node_id, trace_id |
kind |
The producer | What the envelope reports |
category |
The producer | status, event, log, evidence or fault |
emitted_at |
The producer | Emission time |
terminal |
The producer | Whether this envelope ends the runtime's lane |
payload |
The producer | The body |
A producer supplies the kind, the category, the emission time, the terminal
marker and the payload. An append that tries to set seq, prev_digest or
digest is rejected. The lane encodes each envelope canonically before
hashing. A running lane serialises producers through one live cursor and writes
the envelope followed by its resulting cursor as one ordered append. The live
cursor advances only after that append succeeds; reopening the lane verifies
the durable cursor against the journal tail. The same canonical encoding is
used wherever an outcome is fingerprinted for replay comparison. See
The five envelope categories.
Evidence before visibility¶
The nucleus writes authority transitions through the lane. The digest of the committed envelope becomes the nucleus's effect receipt, so a terminal transition becomes visible outside the kernel after its evidence is in the journal. See Evidence effects.
Pull and acknowledge¶
The node pulls a page of envelopes from a sequence number and acknowledges
cumulatively: an ack for a sequence number covers every envelope up to it. A
page returns its envelopes with next_seq, last_acked_seq, max_seq and
whether the lane is terminal. A pull returns 100 envelopes by default and at most 1,000. A pull from the acknowledged cursor returns the oldest page after it.
Acknowledgement advances the durable cursor immediately. The lane keeps the most recent 10,000 acknowledged envelopes as its recovery
window, and acknowledged history occupies at most two windows before the lane
compacts it. A reconnecting node resumes from
last_acked_seq, and every next envelope continues the digest chain from the
last envelope the node acknowledged.
An ack is accepted or rejected with one of five states:
| State | Raised when |
|---|---|
gap |
The ack names a sequence number beyond the last envelope appended |
regression |
The ack is behind the current cursor |
post_terminal |
The ack is past the terminal envelope |
non_owner |
The caller does not own this runtime |
stale_fence |
The caller's ownership fence is superseded |
A rejected ack carries an error_class, whether it is retryable, and
retry_after_seconds. A gap, regression or post_terminal rejection is
deterministic: the node's view has diverged from the lane, and it reconnects
and resumes from last_acked_seq. See
Cumulative acknowledgement upstream
and
Recovering the DP-kernel link.
Closing the lane¶
Two different things are called terminal. An authority subject, such as one
task or one channel, ends with an evidence envelope whose terminal marker is
unset, and the lane stays open. The project runtime ends with the runtime's
terminal envelope, whose terminal marker is set. The node closes its
continuity session on that envelope, and a drain completes on it. See
The terminal envelope.