Deploying the control plane¶
The control plane is the first thing you deploy and the one whose first start matters most: its storage backend, store profile and identity are latched when it comes up and cannot be changed afterwards.
This subsection covers what a deployment contains, the decisions that become permanent, and the two tasks you perform against it. For the whole day-0 path, follow Deployment paths.
In this section¶
- Deployment anatomy covers the two active service roles, the health surface and resources.
- Storage backends and profiles covers the backend and profile settings, their defaults and why both are latched.
- The identity latch covers what the latch records, what activation refuses, and why nodes depend on it.
- Finalization invariants and fail-closed startup covers the checks a finalized deployment runs on itself and how to read a failure.
- Post-finalization limits covers what becomes immutable, what becomes locked, and what stays changeable.
Walkthrough¶
- Deploy the control plane creates the namespace, renders and applies the manifests, waits on the rollout and verifies the latch.
- Roll out a new control-plane version bumps the image across both containers, verifies the result and rolls back.
Before you deploy¶
Decide the storage backend and profile first. A finalized control plane
requires postgres, and both values are checked against the latch on every
start. See Storage backends and profiles.