The operator lane¶
A project runtime is owned by one data plane node, and that node needs to check its health, read its status, switch diagnostics, drain it, and collect its evidence. The operator lane is the authenticated surface for those operations. It is served by the nucleus host over mutual TLS, admits only the node that owns the runtime, and carries control commands and the return stream. Execution requests enter the kernel through its syscall ingress. This page covers what the lane serves, how a caller is admitted, how runtime startup is proven, and the return stream.
Three ways into a project kernel¶
flowchart TB
NODE["Data plane node<br/>owner of this runtime"]
subgraph KERNEL["PROJECT KERNEL"]
direction TB
subgraph LANE["OPERATOR LANE, NUCLEUS HOST"]
direction TB
TLS{{"Mutual TLS<br/>workload identity"}}
ADM{{"Admission<br/>ownership fence first"}}
CS["Control service<br/>handshake, runtime.* commands"]
AH["Assignment lifecycle<br/>handoff and teardown"]
RS[("Return stream<br/>pull, stream, ack")]
TLS --> ADM
ADM --> CS
ADM --> AH
ADM --> RS
end
ING["Syscall ingress<br/>run.*, capability.invoke"]
CELLS["Cells"]
CELLS --> ING
end
NODE <-->|"control and evidence"| TLS
The lane carries three surfaces. The runtime.* operator commands serve health,
status, diagnostics and ownership transitions. The assignment lifecycle has two
typed operations: handoff admits sealed work authority, and teardown ends that
exact fenced assignment. The return stream carries everything the runtime
reports. See
Operator controls
for the ten runtime.* commands and
Syscall exposure profiles
for execution ingress.
Who is admitted¶
The nucleus host is the one process of a cell chain that holds a workload identity, and it terminates the lane's mutual TLS. The data plane mounts one immutable launch contract containing the exact runtime identity, accepted peer identities, trust revision, ownership and return correlation. The kernel obtains the named identity from the SPIFFE Workload API. That API is the exclusive kernel identity source. A caller is admitted when:
- its certificate validates against the current trust bundle;
- it is the expected peer identity for this runtime;
- its ownership fence is the current one;
- its command is in the lane's closed catalog.
Ownership is judged before anything inside the runtime. A caller refused on ownership receives a terminal refusal, because another node owns the runtime. The runtime's short-lived identity is re-issued continuously, and the lane applies a new certificate to new connections while established sessions continue. See Workload identity across the process topology and Readiness handshake and endpoint re-resolution.
Receipt-backed startup facts¶
The launch contract authorises the kernel process to start. Cell readiness
comes exclusively from the
return stream's receipt-backed cell_start_accepted,
cell_monitor_registration_accepted and provider_readiness_accepted events.
Each event carries its receipt digest and the exact runtime-closure identity.
A node reads readiness from those accepted events, and the kernel emits an
accepted event only after the matching host-effect receipt is admitted. See
Cell evidence.
Assignment lifecycle¶
assignment.handoff carries one control-plane-authored, data-plane-reconciled
assignment with its admitted closure and materialization evidence. The kernel
independently opens the exact immutable artifact set, admits the fence and
closure identity, starts the cell, and returns an admission receipt only after
the required lifecycle effects are acknowledged.
assignment.teardown names the same assignment, fence epoch and closure
digest. The kernel refuses a different tuple. A successful response includes
the process-exit receipt and records the assignment as terminal, so retrying
the same teardown returns the recorded terminal authority. The data plane
releases the assignment's content-store
references only after receiving that terminal receipt, then removes the
project runtime workload.
This ordering prevents garbage collection while a cell is admitting or using its closure and prevents workload removal from hiding an unconfirmed guest process. See Process lifecycle and Closure artifact sets and materialization.
The return stream¶
The return stream is the return lane as the node sees it: durable and digest-chained. Pull and streaming operations share one cumulative acknowledgement cursor, so a node that reconnects resumes delivery from the acknowledged position. Lifecycle state is read from the stream, and redelivery is the lane's own work. See The return lane.