Skip to content

Shutdown and drain

A node asked to stop does three things in order: it records the request with its reason, it stops accepting new work, and it waits until nothing is in flight before the process may exit. The same drain state is entered by backpressure, so draining is reversible as well as a path to exit.

This page covers the request, the state it produces, and the condition the node must satisfy before it exits.

The request

flowchart TB
  SIG(["Shutdown signal<br/>or operator request"])
  subgraph PROC["XRATUD PROCESS"]
    direction TB
    REG[("Registry:<br/>shutdown_requested,<br/>shutdown_reason")]
    HLM["Health lifecycle: DRAINING"]
    Q[("Local queue")]
    ORCH["Runtime orchestrator"]
    EXIT{{"Exit gate"}}
  end
  DONE(["Process exits"])
  SIG --> REG
  SIG --> HLM
  REG -->|"each cycle: drain state"| ORCH
  Q -->|"depth"| EXIT
  ORCH -->|"active runtimes"| EXIT
  REG -->|"requested"| EXIT
  EXIT -->|"all three hold"| DONE

One signal writes Registry: shutdown_requested, shutdown_reason and moves Health lifecycle to DRAINING together. Exit gate reads three things each cycle: the request, the depth of Local queue, and the active count from Runtime orchestrator.

The reason defaults to operator_requested when the caller supplies none.

The drain state each cycle

The drain state is a xratud.runtime_drain.v1 document. Its content depends on whether a shutdown has been requested and whether project runtimes are still active:

Shutdown requested Active runtimes cleanup_reason_code decommission_state
No Any shutdown_drain_not_required empty
Yes None shutdown_drain_not_required drain_requested
Yes One or more shutdown_drain_stop_all draining

The third row is the hard stop: with a shutdown requested and runtimes still active, the node stops all of them with the shutdown reason and reports DECOMMISSION_HARD_STOP. The second row reports DECOMMISSION_DRAIN_COMPLETED, because the runtimes are already gone.

Every document carries the generation pair and the finalization evidence references alongside those fields:

desired_generation             the generation the node was asked to reach
observed_generation            the generation it has reached
finalization_evidence_refs     references to the evidence produced while finalizing
cleanup_reason_code            why cleanup ran, or why it was not required
decommission_state             drain_requested or draining
decommission_reason_code       DECOMMISSION_DRAIN_COMPLETED or DECOMMISSION_HARD_STOP
stopped, active_count          what the stop pass did and what remains

The generation pair is how an operator sees whether a decommission has converged: a node is done when the observed generation reaches the desired one and the active count is zero.

The exit condition

Four things must hold together:

a shutdown was requested
the local queue depth is zero
the runtime orchestrator reports no active runtimes
the cycle's own active count is zero

A node that has drained its queue while a runtime is still stopping stays in the loop. The condition is checked on the post-cycle numbers, so one cycle's work is always accounted for before the process may exit.

Draining is also a backpressure state

The same DRAINING phase is entered without any shutdown request, from queue backpressure or from the performance governor. In that case the node pauses intake, finishes what it holds, and returns to ACTIVE once the queue is empty, no runtimes are active and bootstrap is complete.

Reason reported while draining Entered from
drain_requested A shutdown request or an operator drain
queue_backpressure The local queue at its limit
governor_backpressure The performance governor holding work back
drain_inflight The drain signal has cleared and work is still finishing
drain_complete The node has returned to ACTIVE

See Health probes and lifecycle management.