Skip to content

Runtime closure and foundation build

The control plane decides what a project runs on; a node works out the exact bytes and puts them in place. Every step here runs on the node because it needs your registry, your dependency sources or the node's own identity, and every step ends in a signed document the control plane admits before the next one is issued. This section covers the three reconciliation stages a node runs for a project's runtime closure, the two builders those stages use, the image builds a node runs for models and projects, and how the result is assembled into the one document the kernel receives.

What the node runs, and for whom

flowchart TB
  CP["CONTROL PLANE<br/>issues each stage, admits each answer"]
  subgraph NODE["NODE, xratud"]
    direction TB
    subgraph REC["CLOSURE RECONCILIATION, one stage per assignment"]
      direction LR
      S1["foundation_resolution<br/>reference to digest"]
      S2["closure_resolution<br/>deterministic solve"]
      S3["materialization<br/>fetch, verify, open"]
    end
    subgraph BLD["BUILDERS"]
      direction LR
      DCB["Dependency component builder"]
      RFB["Runtime foundation builder"]
    end
    EXE["Executor runtime<br/>model and project image builds"]
    SIG[("Evidence signing key<br/>process lifetime")]
    HO[("Assignment handoff<br/>xck.assignment_handoff.v2")]
    S2 --> DCB
    S3 --> HO
  end
  subgraph YI["YOUR INFRASTRUCTURE"]
    direction LR
    REG[("Registry")]
    SRC[("Approved dependency sources")]
    K8S["Build namespace<br/>Kaniko jobs"]
  end
  K["Project kernel"]
  CP -->|"stage assignments"| REC
  CP -->|"build.model.v1, build.project.v1"| EXE
  REC -->|"signed evidence"| CP
  REC --- SIG
  S1 --> REG
  DCB --> SRC
  DCB --> REG
  S3 --> REG
  EXE --> K8S
  HO --> K

Each stage is a separate assignment, so a node that fails midway leaves only the stages it finished, and the control plane issues the next stage only after it admits the last one's evidence. Everything that touches bytes or credentials stays inside your infrastructure; what reaches the control plane is signed evidence carrying digests.

In this section