Skip to content

Cycle summary and heartbeat projection

The control plane places work on a node by what the node says about itself, so that account has to be complete, current and in one shape. Once per reconcile cycle the node projects its state into a heartbeat: its health, the assignments it holds, its free capacity, and a metadata section for every subsystem that can hold work back or lose reports, including its telemetry spools. At the end of the same cycle it produces a cycle summary, the record of what the cycle did. This page covers the heartbeat's fields, how the node's status is derived, what each metadata section tells the control plane, and the cycle summary.

Two projections per cycle

flowchart TB
  subgraph PREP["PREPARATION"]
    direction LR
    H[("Health, identity state")]
    Q[("Queue, capacity,<br/>governor decision")]
    T[("Trace layer, audit spool,<br/>mux state")]
    X[("Transport, drain,<br/>lease recovery, cache,<br/>build runtime, fabric")]
  end
  HP{{"Heartbeat projection"}}
  CP["Control plane<br/>rollup, scheduler capability record"]
  WK["Intake and assignment reconciliation"]
  CS{{"Cycle summary<br/>completion phase"}}
  RLP["Run loop<br/>continue, or exit when drained"]
  PREP --> HP --> CP
  HP --> WK --> CS --> RLP

The heartbeat is projected from the state preparation captured, before the cycle takes new work, so the control plane places work against the state the node was in when it asked. The cycle summary is produced at the end and records what the cycle did with it.

The heartbeat

The heartbeat is sent once per cycle while the node holds a registration:

Field Holds
status The node's health status
active_assignments The identifiers of the assignments it holds
capacity_available Its free worker slots
metadata One section per subsystem

The control plane updates the node's rollup and its scheduler capability record from it. See Registration and heartbeat emit and Heartbeat rollup and log append.

How the status is derived

The status starts as the node's health status, warming until the node's health has been evaluated. The node's runtime identity can override it:

Runtime identity state status health_reason
healthy The health status The health reason
degraded_revocation_freshness_unknown degraded The identity's reason code
quarantined failed The identity's reason code, or RUNTIME_IDENTITY_QUARANTINED

When the control-plane transport is anything other than active, the health_reason is degraded_cp_unreachable. A node whose identity cannot be trusted reports so itself, and placement sees it without waiting for the identity to expire. See Runtime identity refresh.

The metadata sections

Section Tells the control plane
health_phase, health_reason Where the node is in its lifecycle, and why it is not ready
queue_depth, queue_backpressure_active, queue_depth_by_priority How much admitted work waits locally
runtime_active_count, ipc_backpressure Running kernels, and whether a kernel is pushing back
governor The performance governor's decision, reason and limits, including the flush gates
identity_mode, identity_channel, runtime_identity_state How the node authenticates, and the state of its runtime identity
shutdown Whether a shutdown is requested, and why
runtime_drain The drain's progress
lease_recovery The lease reconciliation performed at startup
cache The cache manager's metrics
build_runtime Build executor state
trace_runtime The trace layer's buffered metrics and logs, and its bound context
audit_runtime The audit and attestation spool's counts, sizes and chain state
telemetry_mux The mux profile in force, its last refresh, and the refresh error
control_plane_transport The transport's mode, backoff and last error
fabric The private fabric routes the node holds

The telemetry sections answer the question a stalled report raises. A growing audit_total_bytes or outbox backlog means the node is holding records the control plane has not taken; a telemetry_mux.last_refresh_error means the node is running on its previous profile; governor.limits.flush_logs at 0 means logs are being held back on purpose. See Where a symptom points.

The heartbeat also carries cp_transport_mode alongside the payload.

The cycle summary

The completion phase produces the cycle summary, the return value of one cycle:

Field Holds
registered Whether the node held a registration
pulled, queued_accepted, queued_rejected Assignments pulled, and admitted or refused by the local queue
processed, failed Assignments the worker phase ran, and how many failed
queue, runtime, ipc_backpressure, runtime_drain Queue, kernel and drain state after the cycle
governor, health, lease_recovery, cache, build_runtime As captured in preparation
control_plane_transport, probe The transport and the health probes after the cycle
observability, audit The trace layer and audit spool after the flush
flushed Records sent per channel: status, events, logs
shutdown_requested, shutdown_reason, shutdown_ready_to_exit The drain decision

The run loop reads shutdown_ready_to_exit from each summary and ends when it is true. A cycle that fails on a transient control-plane error produces no summary; the loop marks the transport degraded, backs off, and runs the next cycle at once. See The run loop and Cycle flush.