What project authoring leaves to resolution¶
The project document names what the project asked for and the policy it was asked under. Every fact about how that request is satisfied belongs to resolution and admission, which run later and under different authority.
flowchart LR
A["runtime.xratu<br/>authoring intent"]
A --> S["Control plane seals<br/>ProjectRuntimeDependencyIntentV1"]
S --> F["Fenced DP assignment"]
F --> R["Data plane resolver<br/>credentialed lookup and build"]
R --> E["Resolution evidence"]
E --> AD["Control plane admits<br/>AdmittedProjectRuntimeDependenciesV1"]
Authoring names which distributions to prepare, which system packages the project needs, and which foundation reference and profile to use. Resolution decides which version each requirement becomes, which exact bytes satisfy it, which foundation digest the reference resolves to, and which approved source the bytes come from.
Fields the intent refuses¶
An authoring document carrying any of these would be its own answer, so each is refused by name:
| Refused field | The decision it would take |
|---|---|
foundation_digest, foundation_profile |
The foundation selection |
prepared_python_components |
The resolution result |
project_system_bindings |
The admitted system set |
resolved_version |
Which version wins |
component_digest, component_digests |
Which bytes |
module_roots, import_roots, provided_modules |
Import authority |
mounts |
What the cell mounts |
install_path |
Where bytes land |
index_url |
Where bytes come from |
credentials |
How they are fetched |
ProjectRuntimeDependencyIntentV1 refuses resolved_version; it carries authoring
intent only, never a resolved source or an import grant
The same rule reaches the authored document, where index_url and
extra_index_url are refused at create time. Approved sources are
control-plane policy. See
Approved dependency sources.
The intent is independent of the foundation¶
One intent is legitimate against two different foundations, which resolve it
differently. torch>=2.4,<3 may be satisfied by a component already in one
foundation's store and built fresh against another.
Changing either input produces a different resolution result, and the fenced resolution assignment binds the two together so neither can move without a new result.
During a build, the control plane constructs that assignment from its persisted project, foundation, approved-source and provider authority. The data plane receives it through assignment pull and returns one digest-bound resolution result. The control plane validates that result independently and stores the admitted dependency set, the final candidate snapshot and the constructed-component inventories immutably under the project build. Runtime-closure assembly reads this stored authority.
What the seal binds¶
The sealed intent carries authoring_document_digest, which binds the exact
runtime.xratu document it was compiled from, and policy_revision, which
records the policy the project was asked under. intent_digest covers the
complete request.
A policy revision is assigned by the control plane, so sealing is the control
plane's step. Editing runtime.xratu afterwards produces a new intent, and the
sealed one stays as it was.
What admission adds, and refuses¶
The admitted result is judged against an independently supplied intent. It
records the prepared Python candidate catalogue and the
project-wide system bindings, each with versions and digests, plus
resolution_evidence_digest and admission_revision.
It refuses any field that would read as an import grant, and it refuses to restate the requirements it resolves:
Set digests are recomputed from their members, so a consumer reading a set digest is reading the set.
Who owns each step¶
The project author writes the two lists in runtime.xratu. The control plane
admits that authored shape at runtime-spec create, then seals it with a policy
revision. The data plane performs the credentialed lookup and build under a
fenced assignment, and returns evidence. The control plane admits that result
against the intent.
Both documents are cross-plane contracts: the control plane produces and admits them, and the data plane validates them against the shared contract. See Who resolves and who admits.